- Both sides of the window blocks must be protected against dirt and damage during the concrete work. Cover plates with a thickness of 3 mm are sufficient. These are supplied by the manufacturer.
- The window(s) and formwork block(s) should be fixed between the formwork walls before the concrete is poured.
- A metal waterstop is placed in the middle of the concrete as a locking flange. This must be degreased and primed with quartz sand/epoxy resin. An injection hose must also be attached on site.
finished installation with 4 underwater windows
styrofoam blocks for the shutter work
window installed, concret poured, styrofoam block still in place